Harbour Line is a fully automatic-mass rapid transit line that mainly connects the city of Hyacinth with the cities of Delta and Brentwood in the Greater Delta region. This 1050 stud-long line is owned and operated by Delta Region Transit, overseen by the Delta City Government, and spans 6 stations. The Harbour Line had opened to the main public in May 2023, using 6000 Series trains for the line.
The line currently runs from its southern terminus, Hyacinth Harbour towards West Central, making 4 stops along the way. Passengers may connect to both the Delta Line and the Central Line. The lines' main color is bright yellow.
Route
The line begins at its southern terminus, Hyacinth Harbour on surface level twin-track. It leaves the station as it makes a slight left and continues straight, making a slight right until it makes a stop at Hyacinth. It leaves Hyacinth as it goes into a downwards slope and enters a twin-track subway tunnel.