The Global Furry Agency Tower (or mostly called The Tower) is the structure of the current Global Furry Agency's Main Headquarters and the Immigration Headquarters in Hokanda. It is located at the Major District of Hokanda.
Building Directories
The Tower consist of 115 floors (110 Floors above ground and 5 Floors below ground), the above ground floors is the common operations location while the below ground floors is the evacuation and breach shelters which can hold the entire population of New Blocker City.
Floors 1 to 110
Public Sectors
- Offices (1 to 15)
- Hokanda Immigration Authorities Department (15-20)
Private Sectors (GFA-Employed/Hokanda Government Members exclusive)
- Meeting Room (20 to 25)
- Director's Office (25 to 45)
- Ethics Board Room (45)
- Administrative Department's Office (46 to 65)
- Operations Room (66 to 98)
- Tactical Office (99 to 108)
- The Global Furry Council Board Room (109)
- The High Table of GFA Board Room (110)
Sublevel 1 to 5
- Evacuation and Breach Shelters (1 to 3)
- Light-Medium Containment Chambers (4)
- Heavy Containment Chambers (5)
Re-Construction
As of April 17, 2031, the Hokanda Immigration Authorities and GFA Site Repairs and Planning Department recently redesigned the interior of the facility. With the following modifications:
- Reinforced Wood-Metal doors, built to resist a brute-forced entry while keeping aesthetics.
- Automated Security Combat Androids stored in every room where high personnel may gather in either emergencies or in general; built to not be reprogrammed or modified to turn against directives.
- Material used for walls, stairs, and certain furniture are combined with general material and reinforced steel to endure explosions from majority of military explosives.
- Windows of certain areas can be shades into opaque to disguise it as empty.
- Offices and Meeting Rooms now holds an emergency lockdown kit in the case of a security breach.
- Doors in certain areas are upgraded to requires either biometric scan or chip scan.