The 2015 New Blockers City, New Bloxia Tornado was a precursor to the devastating 2015 Blackout, which occurred only five minutes after this tornado dissipated. At the head of the front, in New Bloxia, a mesocyclone which would evolve to a funnel cloud and later a 70 mph EF0 tornado was reported, spotted, and touched down near the Blox Electricity power plant. The tornado later tore through the western end of the Blox Electricity power plant, collapsing the Blox Electricity power plant to the point of critical mass on 2355. The tornado later dissipated prior to hitting the eastern end of the Blox Electricity power plant (which avoided the destruction). The tornado resulted in no damages beyond collapsing the Blox Electricity power plant to the point of critical mass as well as claiming no lives.